New Palegic Centre, Redruth
The project consisted of modifications to an existing warehouse building to incorporate new tunnel freezer, hygienic walls and ceilings with resin floors and associated drainage.
New Cold Store Facility, Corby
This project included the civil engineering earthworks, drainage and external works design associated with the construction of a new build circa 630,000 ft2.
New Blow Moulding Facility, Oakthorpe
This project included the civil and structural design for the construction of a new purpose built steel framed extension to the existing Dairy facility.